Hotel DORMERO HoHo

Project details

HoHo Wien Austria, Vienna
Project: HASSLACHER group

Year of Completion: 2019
Investor: Günter Kerbler / cetus Baudevelopment GmbH, Bmstr. Ing. Caroline Palfy, Vienna (AT)
Architecture: Rüdiger Lainer + Partner ZT GmbH, Vienna (AT)²
Structural Engineering: Woschitz Group, Vienna (AT)
Construction Time: 30 months
Number of floors: 24
Plot size: 3 920 m²
Height: 84 м
Gross floor area: 25 500 m² usable floor space, 19 500 m² floor space for rent
Photo: HASSLACHER | cetus Baudevelopment & kito.at

The project aims to establish wood as a construction material in the urban space and prove its efficient usability in the construction of high-rises.
Design:
Currently in construction in Aspern Die Seestadt Wiens, the HoHo Wien is not just a new commercial property but a strong statement for innovation and sustainability. With a height of 84 meters and a total of 24 above-ground floors, the building will be the highest timber high-rise worldwide on the day of its opening. It is located directly at the waterfront and next to the metro station Seestadt. The HoHo Wien accommodates a host of different uses, from hotel, restaurant, fitness/beauty/wellness facilities to offices and conference rooms as well as 24 apartments. These spaces are modeled after Chinese and Buddhist theories of elements (wood, fire, soil, metal, water, air, emptiness). The HoHo Wien opens in spring of 2019.

Wood:
The „simple“ structural system consists of four pre-fabricated, serial constructive elements (studs, joists, ceiling and facade elements).

Its special feature is the drastically lowered usage of steel fasteners and a high degree of prefabrication, made possible by employment of newly developed timber-concrete junctions.
The walls and beams are 100% made of Austrian spruce wood. The ceiling is realized as a timber concrete composite ceiling.
From the third floor up, the building features fiber cement boards completely made of natural resources for its curtain wall facade.

TOTAL AREA:

PROJECT:
HASSLACHER group

AREA:

19 500 м²

PHOTOS:
HASSLACHER | cetus Baudevelopment & kito.at

doc icon 1

Gallery

We specializes in the implementation of TURNKEY projects, which includes the entire range of works and services from concept development and design to construction.

DS 06030
elementary school christian bucher vienna kurt hoerbst1
Azure Feldballe School Henning Larsen 11
2 12
full Velux Group Roof Window on Kindergarten in Poland   1 1
0VMNXFI


Tel. +37065795040E-mail: info@clthomes.eu


Liepų g. 83, Klaipėda, LT92195, Lietuva